Automatic and remote control; band-specific regulations; operating in and communicating with foreign countries; spurious emission standards; HF modulation index limit; band-specific rules
E1C01
§ 97.303
What is the maximum bandwidth for a data emission on 60 meters?
-
A
60 Hz
-
B
170 Hz
-
C
1.5 kHz
-
D
2.8 kHz
E1C02
§ 97.117
Which of the following apply to communications transmitted to amateur stations in foreign countries?
-
A
Third party traffic must be limited to that intended for the exclusive use of government and non-Government Organization (NGOs) involved in emergency relief activities
-
B
All transmissions must be in English
-
C
Communications must be limited to those incidental to the purpose of the amateur service and remarks of a personal nature
-
D
All these choices are correct
E1C03
§ 97.303(g)
How long must an operator wait after filing a notification with the Utilities Technology Council (UTC) before operating on the 2200-meter or 630-meter band?
-
A
Operators must not operate until approval is received
-
B
Operators may operate after 30 days, providing they have not been told that their station is within 1 kilometer of PLC systems using those frequencies
-
C
Operators may not operate until a test signal has been transmitted in coordination with the local power company
-
D
Operations may commence immediately, and may continue unless interference is reported by the UTC
E1C04
What is an IARP?
-
A
A permit that allows US amateurs to operate in certain countries of the Americas
-
B
The internal amateur radio practices policy of the FCC
-
C
An indication of increased antenna reflected power
-
D
A forecast of intermittent aurora radio propagation
E1C05
§ 97.221(c)(1), 97.115(c)
Under what situation may a station transmit third party communications while being automatically controlled?
-
A
Never
-
B
Only when transmitting RTTY or data emissions
-
C
Only when transmitting SSB or CW
-
D
On any mode approved by the National Telecommunication and Information Administration
E1C06
Which of the following is required in order to operate in accordance with CEPT rules in foreign countries where permitted?
-
A
You must identify in the official language of the country in which you are operating
-
B
The US embassy must approve of your operation
-
C
You must have a copy of FCC Public Notice DA 16-1048
-
D
You must append "/CEPT" to your call sign
E1C07
§ 97.303(g)
What notifications must be given before transmitting on the 630- or 2200-meter bands?
-
A
A special endorsement must be requested from the FCC
-
B
An environmental impact statement must be filed with the Department of the Interior
-
C
Operators must inform the FAA of their intent to operate, giving their call sign and distance to the nearest runway
-
D
Operators must inform the Utilities Technology Council (UTC) of their call sign and coordinates of the station
E1C08
§ 97.213
What is the maximum permissible duration of a remotely controlled station's transmissions if its control link malfunctions?
-
A
30 seconds
-
B
3 minutes
-
C
5 minutes
-
D
10 minutes
E1C09
§ 97.307
What is the highest modulation index permitted at the highest modulation frequency for angle modulation below 29.0 MHz?
-
A
0.5
-
B
1.0
-
C
2.0
-
D
3.0
E1C10
§ 97.307
What is the maximum mean power level for a spurious emission below 30 MHz with respect to the fundamental emission?
-
A
- 43 dB
-
B
- 53 dB
-
C
- 63 dB
-
D
- 73 dB
E1C11
§ 97.5
Which of the following operating arrangements allows an FCC-licensed US citizen to operate in many European countries, and amateurs from many European countries to operate in the US?
-
A
CEPT
-
B
IARP
-
C
ITU reciprocal license
-
D
All these choices are correct
E1C12
§ 97.305(c)
In what portion of the 630-meter band are phone emissions permitted?
-
A
None
-
B
Only the top 3 kHz
-
C
Only the bottom 3 kHz
-
D
The entire band